Home Sign permits

Sign permits in Raleigh, NC

Most permanent business signs in Raleigh need a city permit before they go up. We prepare the drawings, file the application and handle the back and forth with the city.

What a Raleigh sign permit asks for

  • A drawing of the sign with measurements, colors and materials
  • Building elevations for wall signs
  • A site plan showing property lines and the sign location
  • Owner or landlord signature on the drawing
  • Electrical details for lit signs

Why the permit comes first

In Raleigh, a business sign visible from the public street needs a zoning permit, and it has to meet the sign rules in Chapter 7 of the city's Unified Development Ordinance. Those rules cover how big a sign can be, how tall, where it can sit and how it can be lit. The city strongly advises not building a sign until the permit is issued.

That's why we treat the permit as part of the design, not paperwork at the end. We size the sign to what your wall or lot allows, put together the drawings and site plan the city asks for, get your landlord's sign-off and submit the application. You get a sign that passes review instead of one that has to be rebuilt.

Older signs need care too. Raleigh allows routine maintenance on a sign that no longer meets current rules, but replacing or significantly altering it can mean the whole sign has to come up to code. We check that before we quote a change.

Which signs need a Raleigh permit

Based on the city sign permit page and UDO Article 7.3.

  • Window and A-frame signs

    Window signs and A-frame sidewalk signs do not need a sign permit in Raleigh, but they still have size and placement rules.

What we handle for you

  1. Check the rules

    We look at your zoning, any common signage plan for your center and any HOA or landlord rules.

  2. Size the sign

    The design is built to fit what your wall or frontage allows.

  3. Prepare drawings

    Sign details, elevations, a site plan, and footing or electrical details when needed.

  4. File and follow up

    We submit the application and answer the city reviewers until it is approved.

  5. Install and inspect

    Once issued, we build and install, and line up any inspection the permit requires.

Things that can add a step

Not every sign needs these, but it helps to know about them early.

Shared sites
If more than one business or principal building is on the property, Raleigh will not issue a sign permit until a common signage plan for the site is approved.
Historic districts
A sign in a Raleigh historic district needs a Certificate of Appropriateness.
Taller ground signs
A ground sign over 42 inches needs a sealed, engineered footing detail with the application.
Signs over the sidewalk
A sign over or on the public right-of-way that is not fixed to the sidewalk needs a minor encroachment approval.
Changes to older signs
If you alter, replace or convert a sign that does not meet current rules, the whole sign has to be brought up to code.

Sign permit questions

Related reading

Get a free sign quote, permit included

Tell us what you need and where it goes. Carlo will get back to you with questions or a price.

  • Free quote, no obligation
  • We handle the permit
  • Design, build and install in one shop

Rather talk it through?
Call 919-696-0353